Work Orders

159 total · fleet maintenance, road repair, shop activity across all counties

Specific dispatches of work — crew assignments to Jobs (field) or Equipment service (shop).

↓ From:Manually created+auto-generated by PM scheduler·↑ Feeds:Combined Daily WO# references → Job cost rollups → Equipment maintenance history

$15,815.00

Open · 27 WOs

1 overdue

$38,287.49

In Progress · 27 WOs

Avg time to complete: 4.2 days

$37,489.00

Complete (this month) · 29

On-time: 0%

27 active

Equipment in Shop · 5 units

3 awaiting parts

→
159 of 159

Open (27)

$33,194.00
1 overdue1 emergency
WO-2026-2000
PMHigh

Brake & hydraulic line PM — interval reached (250 hrs)

SC-114 GRDR-200-3d
Mil-Shop-A
Scheduled 10/3/2026
Under J-2026-014
$245.00 est4h est
WO-2026-2071
REPEmergency

Shoulder repair — STH 145 emergency response

MAN-202 GRDR-2000d
Man-Crew-1
Scheduled 9/30/2026
Under J-2026-022
$5,800.00 est24h est
WO-2026-2072
ROAD

Crack seal route — Sauk Segment 3

—-5d
Sauk-Crew-1
Scheduled 10/5/2026
Under J-2026-014
$1,850.00 est8h est
WO-2026-0044
ROAD

STH 33 mile 22 — shoulder repair, south lane (scheduled cold-patch).

—134d
Under J-2026-014
$0.00 est
WO-2026-2006
INSP

Annual safety inspection — operator side

—-7d
Brown-Crew-1
Scheduled 10/7/2026
Under J-2026-108
$200.00 est2h est
WO-2026-2012
PM

Brake & hydraulic PM — interval reached

—-13d
Brown-Crew-1
Scheduled 10/13/2026
Under J-2026-114
$400.00 est4h est
WO-2026-2018
INSP

Annual safety inspection — operator side

—-5d
Brown-Crew-1
Scheduled 10/5/2026
Under J-2026-018
$360.00 est2h est
WO-2026-2024
PM

Engine oil change @ 250 hr interval

—-11d
Brown-Crew-1
Scheduled 10/11/2026
Under J-2026-110
$560.00 est4h est
WO-2026-2030
INSP

Annual safety inspection — operator side

—-3d
Brown-Crew-1
Scheduled 10/3/2026
Under J-2026-XC-001
$120.00 est2h est
WO-2026-2036
PM

Brake & hydraulic PM — interval reached

—-9d
Brown-Crew-1
Scheduled 10/9/2026
Under J-2026-106
$320.00 est4h est
WO-2026-2042
INSP

Annual safety inspection — operator side

—-1d
Brown-Crew-1
Scheduled 10/1/2026
Under J-2026-112
$280.00 est2h est
WO-2026-2048
PM

Engine oil change @ 250 hr interval

—-7d
Brown-Crew-1
Scheduled 10/7/2026
Under J-2026-014
$480.00 est4h est
WO-2026-2054
INSP

Annual safety inspection — operator side

—-13d
Brown-Crew-1
Scheduled 10/13/2026
Under J-2026-108
$440.00 est2h est
WO-2026-2060
PM

Brake & hydraulic PM — interval reached

—-5d
Brown-Crew-1
Scheduled 10/5/2026
Under J-2026-114
$240.00 est4h est
WO-2026-2066
INSP

Annual safety inspection — operator side

—-11d
Brown-Crew-1
Scheduled 10/11/2026
Under J-2026-018
$200.00 est2h est
WO-2026-2078
INSP

Annual safety inspection — operator side

—-9d
Brown-Crew-1
Scheduled 10/9/2026
Under J-2026-XC-001
$360.00 est2h est
WO-2026-2084
PM

Brake & hydraulic PM — interval reached

—-1d
Brown-Crew-1
Scheduled 10/1/2026
Under J-2026-106
$560.00 est4h est
WO-2026-2090
INSP

Annual safety inspection — operator side

—-7d
Brown-Crew-1
Scheduled 10/7/2026
Under J-2026-112
$120.00 est2h est
WO-2026-2096
PM

Engine oil change @ 250 hr interval

—-13d
Brown-Crew-1
Scheduled 10/13/2026
Under J-2026-014
$320.00 est4h est
WO-2026-2102
INSP

Annual safety inspection — operator side

—-5d
Brown-Crew-1
Scheduled 10/5/2026
Under J-2026-108
$280.00 est2h est
WO-2026-2108
PM

Brake & hydraulic PM — interval reached

—-11d
Brown-Crew-1
Scheduled 10/11/2026
Under J-2026-114
$480.00 est4h est
WO-2026-2114
INSP

Annual safety inspection — operator side

—-3d
Brown-Crew-1
Scheduled 10/3/2026
Under J-2026-018
$440.00 est2h est
WO-2026-2120
PM

Engine oil change @ 250 hr interval

—-9d
Brown-Crew-1
Scheduled 10/9/2026
Under J-2026-110
$240.00 est4h est
WO-2026-2126
INSP

Annual safety inspection — operator side

—-1d
Brown-Crew-1
Scheduled 10/1/2026
Under J-2026-XC-001
$200.00 est2h est
WO-2026-2132
PM

Brake & hydraulic PM — interval reached

—-7d
Brown-Crew-1
Scheduled 10/7/2026
Under J-2026-106
$400.00 est4h est
WO-2026-2138
INSP

Annual safety inspection — operator side

—-13d
Brown-Crew-1
Scheduled 10/13/2026
Under J-2026-112
$360.00 est2h est
WO-2026-2144
PM

Engine oil change @ 250 hr interval

—-5d
Brown-Crew-1
Scheduled 10/5/2026
Under J-2026-014
$560.00 est4h est

In Progress (27)

$38,287.49
WO-2026-0871
REPHigh

Replace front brake pads + hydraulic line — wheel loader MIL-301

MIL-301 LOAD-3003d
Mil-Shop-A
Scheduled 9/27/2026
Under J-2026-105
$1,150.00 est6h est
WO-2026-0042
ROAD

Patch crew dispatch · CTH-K mile 12-13 (bituminous patching, north lane).

SC-114 GRDR-2007d
Under J-2026-014
$0.00 est
WO-2026-2001
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-2d
Sauk-Crew-2
Scheduled 10/2/2026
Under J-2026-022
$680.00 est10h est
WO-2026-2007
ROADHigh

Pavement crack sealing route

DN-220 PICKUP-050-8d
Sauk-Crew-2
Scheduled 10/8/2026
Under J-2026-109
$640.00 est8h est
WO-2026-2013
REPLow

Alternator failure — replace

MIL-301 LOAD-300-14d
Sauk-Crew-2
Scheduled 10/14/2026
Under J-2026-115
$840.00 est10h est
WO-2026-2019
ROADHigh

Pavement crack sealing route

DN-115 SPRDR-225-6d
Sauk-Crew-2
Scheduled 10/6/2026
Under J-2026-105
$800.00 est8h est
WO-2026-2025
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-12d
Sauk-Crew-2
Scheduled 10/12/2026
Under J-2026-111
$600.00 est10h est
WO-2026-2031
ROADHigh

Pavement crack sealing route

DN-220 PICKUP-050-4d
Sauk-Crew-2
Scheduled 10/4/2026
Under J-2026-MUNI-001
$560.00 est8h est
WO-2026-2037
REPLow

Alternator failure — replace

MIL-301 LOAD-300-10d
Sauk-Crew-2
Scheduled 10/10/2026
Under J-2026-107
$760.00 est10h est
WO-2026-2043
ROADHigh

Pavement crack sealing route

DN-115 SPRDR-225-2d
Sauk-Crew-2
Scheduled 10/2/2026
Under J-2026-113
$720.00 est8h est
WO-2026-2049
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-8d
Sauk-Crew-2
Scheduled 10/8/2026
Under J-2026-022
$920.00 est10h est
WO-2026-2055
ROADHigh

Pavement crack sealing route

DN-220 PICKUP-050-14d
Sauk-Crew-2
Scheduled 10/14/2026
Under J-2026-109
$480.00 est8h est
WO-2026-2061
REPLow

Alternator failure — replace

MIL-301 LOAD-300-6d
Sauk-Crew-2
Scheduled 10/6/2026
Under J-2026-115
$680.00 est10h est
WO-2026-2067
ROADHigh

Pavement crack sealing route

DN-115 SPRDR-225-12d
Sauk-Crew-2
Scheduled 10/12/2026
Under J-2026-105
$640.00 est8h est
WO-2026-2073
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-4d
Sauk-Crew-2
Scheduled 10/4/2026
Under J-2026-111
$840.00 est10h est
WO-2026-2079
ROADHigh

Pavement crack sealing route

DN-220 PICKUP-050-10d
Sauk-Crew-2
Scheduled 10/10/2026
Under J-2026-MUNI-001
$800.00 est8h est
WO-2026-2085
REPLow

Alternator failure — replace

MIL-301 LOAD-300-2d
Sauk-Crew-2
Scheduled 10/2/2026
Under J-2026-107
$600.00 est10h est
WO-2026-2091
ROADHigh

Pavement crack sealing route

DN-115 SPRDR-225-8d
Sauk-Crew-2
Scheduled 10/8/2026
Under J-2026-113
$560.00 est8h est
WO-2026-2097
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-14d
Sauk-Crew-2
Scheduled 10/14/2026
Under J-2026-022
$760.00 est10h est
WO-2026-2103
ROADHigh

Pavement crack sealing route

DN-220 PICKUP-050-6d
Sauk-Crew-2
Scheduled 10/6/2026
Under J-2026-109
$720.00 est8h est
WO-2026-2109
REPLow

Alternator failure — replace

MIL-301 LOAD-300-12d
Sauk-Crew-2
Scheduled 10/12/2026
Under J-2026-115
$920.00 est10h est
WO-2026-2115
ROADHigh

Pavement crack sealing route

DN-115 SPRDR-225-4d
Sauk-Crew-2
Scheduled 10/4/2026
Under J-2026-105
$480.00 est8h est
WO-2026-2121
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-10d
Sauk-Crew-2
Scheduled 10/10/2026
Under J-2026-111
$680.00 est10h est
WO-2026-2127
ROADHigh

Pavement crack sealing route

DN-220 PICKUP-050-2d
Sauk-Crew-2
Scheduled 10/2/2026
Under J-2026-MUNI-001
$640.00 est8h est
WO-2026-2133
REPLow

Alternator failure — replace

MIL-301 LOAD-300-8d
Sauk-Crew-2
Scheduled 10/8/2026
Under J-2026-107
$840.00 est10h est
WO-2026-2139
ROADHigh

Pavement crack sealing route

DN-115 SPRDR-225-14d
Sauk-Crew-2
Scheduled 10/14/2026
Under J-2026-113
$800.00 est8h est
WO-2026-2145
REP

Brake adjustment — pulling left

MIL-412 PLOW-100-6d
Sauk-Crew-2
Scheduled 10/6/2026
Under J-2026-022
$600.00 est10h est

Complete (80)

$109,957.20
WO-2026-1880
PM

PM Service @ 8,170 hrs — interval reached

SC-114 GRDR-20070d
Under J-2026-014
$245.00 est4h est
WO-2026-1745
REPHigh

Repair — hydraulic leak at boom cylinder

SC-114 GRDR-200135d
Under J-2026-014
$640.00 est8h est
WO-2026-1502
PM

PM Service @ 7,920 hrs — interval reached

SC-114 GRDR-200195d
Under J-2026-014
$245.00 est4h est
WO-2026-0039
ROAD

STH 33 mile 8.4-9.1 — pothole patching pass (April backlog).

SC-114 GRDR-200148d
Under J-2026-014
$0.00 est
WO-2026-0028
INSP

Crack-seal inspection pass (CTH-K mile 0-16) — pre-season survey.

—161d
Under J-2026-014
$0.00 est
WO-2026-2002
INSP

Annual safety inspection — operator side

MAN-202 GRDR-20013d
Dane-Crew-1
Scheduled 9/17/2026
Under J-2026-018
$280.00 est2h est
WO-2026-2003
ROADHigh

Shoulder reshape — CTH F

—20d
Mil-Shop-A
Scheduled 9/10/2026
Under J-2026-105
$720.00 est8h est
WO-2026-2004
PM

Brake & hydraulic PM — interval reached

BR-501 PAVER-40027d
Man-Crew-1
Scheduled 9/3/2026
Under J-2026-106
$560.00 est4h est
WO-2026-2008
PM

Engine oil change @ 250 hr interval

SC-114 GRDR-20055d
Dane-Crew-1
Scheduled 8/6/2026
Under J-2026-110
$480.00 est4h est
WO-2026-2009
REP

Brake adjustment — pulling left

—62d
Mil-Shop-A
Scheduled 7/30/2026
Under J-2026-111
$920.00 est10h est
WO-2026-2010
INSP

Annual safety inspection — operator side

MAN-202 GRDR-20069d
Man-Crew-1
Scheduled 7/23/2026
Under J-2026-112
$120.00 est2h est
WO-2026-2014
INSP

Annual safety inspection — operator side

SC-202 DUMP-1507d
Dane-Crew-1
Scheduled 9/23/2026
Under J-2026-XC-001
$440.00 est2h est
WO-2026-2015
ROADHigh

Shoulder reshape — CTH F

—14d
Mil-Shop-A
Scheduled 9/16/2026
Under J-2026-MUNI-001
$480.00 est8h est
WO-2026-2016
PM

Engine oil change @ 250 hr interval

SC-114 GRDR-20021d
Man-Crew-1
Scheduled 9/9/2026
Under J-2026-014
$320.00 est4h est
WO-2026-2020
PM

Brake & hydraulic PM — interval reached

BR-501 PAVER-40049d
Dane-Crew-1
Scheduled 8/12/2026
Under J-2026-106
$240.00 est4h est
WO-2026-2021
REPLow

Alternator failure — replace

—56d
Mil-Shop-A
Scheduled 8/5/2026
Under J-2026-107
$680.00 est10h est
WO-2026-2022
INSP

Annual safety inspection — operator side

SC-202 DUMP-15063d
Man-Crew-1
Scheduled 7/29/2026
Under J-2026-108
$280.00 est2h est
WO-2026-2026
INSP

Annual safety inspection — operator side

MAN-202 GRDR-2001d
Dane-Crew-1
Scheduled 9/29/2026
Under J-2026-112
$200.00 est2h est
WO-2026-2027
ROADHigh

Shoulder reshape — CTH F

—8d
Mil-Shop-A
Scheduled 9/22/2026
Under J-2026-113
$640.00 est8h est
WO-2026-2028
PM

Brake & hydraulic PM — interval reached

BR-501 PAVER-40015d
Man-Crew-1
Scheduled 9/15/2026
Under J-2026-114
$480.00 est4h est
WO-2026-2032
PM

Engine oil change @ 250 hr interval

SC-114 GRDR-20043d
Dane-Crew-1
Scheduled 8/18/2026
Under J-2026-014
$400.00 est4h est
WO-2026-2033
REP

Brake adjustment — pulling left

—50d
Mil-Shop-A
Scheduled 8/11/2026
Under J-2026-022
$840.00 est10h est
WO-2026-2034
INSP

Annual safety inspection — operator side

MAN-202 GRDR-20057d
Man-Crew-1
Scheduled 8/4/2026
Under J-2026-018
$440.00 est2h est
WO-2026-2038
INSP

Annual safety inspection — operator side

SC-202 DUMP-15085d
Dane-Crew-1
Scheduled 7/7/2026
Under J-2026-108
$360.00 est2h est
WO-2026-2039
ROADHigh

Shoulder reshape — CTH F

—2d
Mil-Shop-A
Scheduled 9/28/2026
Under J-2026-109
$800.00 est8h est
WO-2026-2040
PM

Engine oil change @ 250 hr interval

SC-114 GRDR-2009d
Man-Crew-1
Scheduled 9/21/2026
Under J-2026-110
$240.00 est4h est
WO-2026-2044
PM

Brake & hydraulic PM — interval reached

BR-501 PAVER-40037d
Dane-Crew-1
Scheduled 8/24/2026
Under J-2026-114
$560.00 est4h est
WO-2026-2045
REPLow

Alternator failure — replace

—44d
Mil-Shop-A
Scheduled 8/17/2026
Under J-2026-115
$600.00 est10h est
WO-2026-2046
INSP

Annual safety inspection — operator side

SC-202 DUMP-15051d
Man-Crew-1
Scheduled 8/10/2026
Under J-2026-XC-001
$200.00 est2h est
WO-2026-2050
INSP

Annual safety inspection — operator side

MAN-202 GRDR-20079d
Dane-Crew-1
Scheduled 7/13/2026
Under J-2026-018
$120.00 est2h est