Work Orders / WO-2026-2004

WO-2026-2004

PM ServiceNormal priorityComplete

Brake & hydraulic PM — interval reached

PM Service dispatch — field work charging to a parent Job.

↓ From:Created 2026-09-01·↑ Feeds:Labor / EQP / Materials charges via Combined Daily → Parent Job cost → Equipment maintenance history

Work Type

PM Service

Manitowoc County

Equipment

BR-501

PAVER-400

Assigned Crew

Man-Crew-1

Foreman: Casey Braun

Scheduled

9/3/26, 8:00 AM

Est 4 hrs

Parent Job

J-2026-106

CTH M — Bridge Deck Repair (SK)

Open

9/3/2026
by shop supervisor

In Progress

9/3/2026
by shop supervisor

Complete

In stage

PM Details

PM Trigger

Interval

250 hours

Last PM

6/14/2026

@ 7,948 hours

Equipment Meter

Current: 3,210 hours

Triggered @ 8,198

Service Checklist

  • Inspect at intake
  • Replace consumables per interval
  • Top off fluids
  • Test operation
  • Update PM log

Standard Parts

  • ·Engine oil4 gal
  • ·Oil filter1 ea
  • ·Air filter1 ea
  • ·Shop rags1 pkg

Charges — Labor

$192.00

0 employees, 3.2 hrs est

Charges — EQP

$174.00

0 equipment lines

Charges — Materials

$76.00

0 part lines

Total / Variance

$442.00 of $560.00 est

21% under