Work Orders / WO-2026-2000

WO-2026-2000

PM ServiceHigh priorityOpen

Brake & hydraulic line PM — interval reached (250 hrs)

PM Service dispatch — field work charging to a parent Job.

↓ From:Created 2026-09-29·↑ Feeds:Labor / EQP / Materials charges via Combined Daily → Parent Job cost → Equipment maintenance history

Work Type

PM Service

Sauk County

Equipment

SC-114

GRDR-200

Assigned Crew

Mil-Shop-A

Foreman: Jordan Ellis

Scheduled

10/3/26, 8:00 AM

Est 4 hrs

Parent Job

J-2026-014

STH 33 — Bituminous Patching, Sauk Segment 4

Open

In stage

In Progress
Complete

PM Details

PM Trigger

Interval

250 hours

Last PM

7/27/2026

@ 8,170 hours

Equipment Meter

Current: 8,442 hours

Triggered @ 8,420

Service Checklist

  • Inspect brake pads
  • Replace hydraulic line
  • Top off hydraulic fluid
  • Check fluid levels
  • Replace air filter
  • Test brake function
  • Update PM log

Standard Parts

  • ·Brake pads (front)1 set
  • ·Hydraulic line — 8 ft1 assy
  • ·Hydraulic fluid2 gal
  • ·Oil filter1 ea
  • ·Air filter1 ea
  • ·Shop rags1 pkg

Charges — Labor

$0.00

6 employees, 0.0 hrs est

Charges — EQP

$0.00

2 equipment lines

Charges — Materials

$0.00

6 part lines

Total / Variance

$0.00 of $245.00 est

100% under

DateBatchEmployeeHoursOTRateCostSource
2026-09-29bch-lab-2026-001emp-bill-hauser8—$42.84$342.72Combined Daily
2026-09-29bch-lab-2026-001emp-tina-berg8—$36.08$288.64Combined Daily
2026-09-29bch-lab-2026-001emp-doug-liu8—$35.83$286.64Combined Daily
2026-09-29bch-lab-2026-001emp-sara-mahmoud8—$36.18$369.42Combined Daily
TOTAL32 hrs$1,287.42

Estimated 4 hrs · Actual 32 hrs · Variance +28.0 hrs