Inventory / Warehouses / BRO-W1

Brown Main Yard

BRO-W1 · Brown County · Open since 2018-03-15

Status

OPEN

Inventory value

$198,643.00

SKU count

15

0 below reorder · 0 stockout

Last activity

Issue · 5 hrs ago

Responsible

Casey Braun

Stockroom Supervisor

OPEN — issues and receipts allowed.

$198,643.00

Inventory Value

+$1,200 this week
vs last week

15

SKUs Stocked

15 in stock · 0 below reorder · 0 stockout

18

Transactions This Period

8 issues · 2 receipts · 2 adjustments

60 days

Avg Days to Turnover

Consumption velocity

On-Hand Items (15 of 15)

SKUItemClassOn HandReorderAvg CostValueLast ActivityDays→Reorder
WH-BRO-W1-1016White Striping PaintCONS292 EA20$96.40$28,148.8029 hrs ago—
WH-BRO-W1-1017Sign Posts — 12ftCONS309 BAG20$109.80$33,928.205 hrs ago271d
WH-BRO-W1-1018Sign Posts — 14ftCONS326 BX20$123.20$40,163.2044 d ago—
WH-BRO-W1-1019Reflective TapeCONS343 LB20$16.60$5,693.804 d ago—
WH-BRO-W1-1020Concrete Patch MixCONS360 DRM20$28.00$10,080.0041 d ago—
WH-BRO-W1-1021Curing CompoundCONS377 TON20$41.40$15,607.808 d ago—
WH-BRO-W1-1022Crack Sealant — 30lbCONS394 GAL20$54.80$21,591.205 d ago935d
WH-BRO-W1-1023Spray LubricantCONS31 EA20$68.20$2,114.2035 d ago—
WH-BRO-W1-1024Salt Brine 23%CONS48 BAG20$81.60$3,916.8053 d ago—
WH-BRO-W1-1025Bituminous Tack CoatCONS65 BX20$93.00$6,045.00No activity—
WH-BRO-W1-1026Sand — WinterCONS82 LB20$106.40$8,724.80No activity—
WH-BRO-W1-1027Sand — ConstructionCONS99 DRM20$119.80$11,860.2023 d ago—
WH-BRO-W1-1028Cold Patch PremiumCONS116 TON20$13.20$1,531.2011 d ago—
WH-BRO-W1-1029Engine Oil 15W-40CONS133 GAL20$26.60$3,537.8029 d ago—
WH-BRO-W1-1030Engine Oil 5W-30CONS150 EA20$38.00$5,700.0020 d ago433d

Transaction History (38)

TypeDateSKUQtyValueSourceUser
Issue2026-09-30WH-BRO-W1-1017

Sign Posts — 12ft

-11 BAG-$1,207.80IMP-BARCODE-2026-05-15Pat Keller
Issue2026-09-29WH-BRO-W1-1016

White Striping Paint

-2 EA-$192.80DS-SAUK-1-2026-05-18Pat Keller
Receipt2026-09-28WH-BRO-W1-1016

White Striping Paint

+185 EA$17,834.00IMP-FUEL-2026-535Casey Braun
Issue2026-09-27WH-BRO-W1-1017

Sign Posts — 12ft

-7 BAG-$768.60IMP-BARCODE-2026-05-15Alex Nguyen
Adjustment2026-09-26WH-BRO-W1-1019

Reflective Tape

-2 LB-$33.20BCH-2026-INV-ADJ-014Casey Braun
Transfer Out2026-09-25WH-BRO-W1-1022

Crack Sealant — 30lb

-11 GAL-$602.80XFR-2026-040→ DAN-W1Pat Keller
Issue2026-09-22WH-BRO-W1-1021

Curing Compound

-5 TON-$207.00IMP-BARCODE-2026-05-15Pat Keller
Transfer In2026-09-19WH-BRO-W1-1028

Cold Patch Premium

+17 TON$224.40XFR-2026-042→ MIL-W1Alex Nguyen
Issue2026-09-16WH-BRO-W1-1022

Crack Sealant — 30lb

-12 GAL-$657.60DS-SAUK-1-2026-05-18Alex Nguyen
Receipt2026-09-13WH-BRO-W1-1021

Curing Compound

+265 TON$10,971.00IMP-FUEL-2026-415Alex Nguyen
Transfer Out2026-09-10WH-BRO-W1-1022

Crack Sealant — 30lb

-11 GAL-$602.80XFR-2026-045→ DAN-W1Pat Keller
Transfer Out2026-09-10WH-BRO-W1-1030

Engine Oil 5W-30

-24 EA-$912.00XFR-2026-025→ MAN-W1Alex Nguyen
Transfer Out2026-09-07WH-BRO-W1-1027

Sand — Construction

-21 DRM-$2,515.80XFR-2026-026→ DAN-W1Casey Braun
Issue2026-09-07WH-BRO-W1-1016

White Striping Paint

-4 EA-$385.60DS-SAUK-1-2026-05-18Pat Keller
Issue2026-09-04WH-BRO-W1-1017

Sign Posts — 12ft

-14 BAG-$1,537.20Standalone IssueJordan Ellis
Issue2026-09-04WH-BRO-W1-1030

Engine Oil 5W-30

-9 EA-$342.00IMP-BARCODE-2026-05-15Pat Keller
Transfer Out2026-09-01WH-BRO-W1-1021

Curing Compound

-20 TON-$828.00XFR-2026-048→ SC-W1Jordan Ellis
Adjustment2026-09-01WH-BRO-W1-1029

Engine Oil 15W-40

0 GAL$0.00BCH-2026-INV-ADJ-018Pat Keller
Issue2026-08-29WH-BRO-W1-1022

Crack Sealant — 30lb

-9 GAL-$493.20BCH-2026-INV-ADJ-014Morgan Reed
Issue2026-08-29WH-BRO-W1-1028

Cold Patch Premium

-4 TON-$52.80Standalone IssuePat Keller
Issue2026-08-26WH-BRO-W1-1027

Sand — Construction

-4 DRM-$479.20Standalone IssuePat Keller
Issue2026-08-26WH-BRO-W1-1023

Spray Lubricant

-1 EA-$68.20BCH-2026-INV-ADJ-014Casey Braun
Issue2026-08-23WH-BRO-W1-1019

Reflective Tape

-3 LB-$49.80IMP-BARCODE-2026-05-15Alex Nguyen
Issue2026-08-23WH-BRO-W1-1028

Cold Patch Premium

-14 TON-$184.80IMP-PARTS-2026-05-17Jordan Ellis
Issue2026-08-20WH-BRO-W1-1020

Concrete Patch Mix

-6 DRM-$168.00DS-SAUK-1-2026-05-18Pat Keller
Transfer In2026-08-20WH-BRO-W1-1027

Sand — Construction

+16 DRM$1,916.80XFR-2026-052→ DAN-W1Jordan Ellis
Receipt2026-08-17WH-BRO-W1-1018

Sign Posts — 14ft

+472 BX$58,150.40IMP-FUEL-2026-822Morgan Reed
Issue2026-08-17WH-BRO-W1-1022

Crack Sealant — 30lb

-1 GAL-$54.80BCH-2026-INV-ADJ-014Alex Nguyen
Adjustment2026-08-14WH-BRO-W1-1016

White Striping Paint

-2 EA-$192.80BCH-2026-INV-ADJ-044Alex Nguyen
Receipt2026-08-14WH-BRO-W1-1020

Concrete Patch Mix

+204 DRM$5,712.00IMP-FUEL-2026-504Jordan Ellis
Adjustment2026-08-11WH-BRO-W1-1021

Curing Compound

-3 TON-$124.20BCH-2026-INV-ADJ-025Morgan Reed
Transfer In2026-08-11WH-BRO-W1-1029

Engine Oil 15W-40

+23 GAL$611.80XFR-2026-055→ MIL-W2Jordan Ellis
Issue2026-08-08WH-BRO-W1-1020

Concrete Patch Mix

-11 DRM-$308.00IMP-BARCODE-2026-05-15Morgan Reed
Receipt2026-08-08WH-BRO-W1-1024

Salt Brine 23%

+223 BAG$18,196.80IMP-FUEL-2026-473Alex Nguyen
Issue2026-08-05WH-BRO-W1-1030

Engine Oil 5W-30

-12 EA-$456.00DS-SAUK-1-2026-05-18Pat Keller
Issue2026-08-05WH-BRO-W1-1017

Sign Posts — 12ft

-1 BAG-$109.80BCH-2026-INV-ADJ-014Jordan Ellis
Transfer In2026-08-02WH-BRO-W1-1027

Sand — Construction

+11 DRM$1,317.80XFR-2026-038→ DAN-W1Alex Nguyen
Issue2026-07-30WH-BRO-W1-1029

Engine Oil 15W-40

-5 GAL-$133.00IMP-FUEL-2026-05-18Casey Braun

Open Work Orders Needing Parts from This Warehouse (6)

WO #DescriptionNeedsAvailability
WO-2026-2006Annual safety inspection — operator side

—

1 EA White Striping PaintAvailable
WO-2026-2012Brake & hydraulic PM — interval reached

—

2 LB Reflective Tape · 2 DRM Concrete Patch MixAvailable
WO-2026-2018Annual safety inspection — operator side

—

3 GAL Crack Sealant — 30lb · 1 EA Spray LubricantAvailable
WO-2026-2024Engine oil change @ 250 hr interval

—

4 BX Bituminous Tack CoatInsufficient
WO-2026-2030Annual safety inspection — operator side

—

1 TON Cold Patch Premium · 1 GAL Engine Oil 15W-40Available
WO-2026-2036Brake & hydraulic PM — interval reached

—

2 EA White Striping Paint · 2 BAG Sign Posts — 12ftAvailable